J-POWER

Greenhouse gas emissions & sustainability report data

📊 Latest report period: 2024🗂️ Report periods on file: 2024, 2023, 2022-03 to 2023-03, 2022, 2021

In its 2024 reporting, J-POWER disclosed greenhouse gas emissions of 44.4M t-CO2e/year (Scope 1). By scope: Scope 1: 44.4M t-CO2e/year. Figures are as stated in the company's own report and may use different boundaries, units or methods (for example market-based vs location-based Scope 2), so compare with care.

💨
GHG Emissions
44.4M t-CO2e/year (Scope 1)
2024
⚡
Renewable Energy
13.2% (Hydroelectric)
of total energy
💧
Water Usage
61.3M thousand m3/year (withdrawn) 19400 thousand m3/year (consumed)
2024
♻️
Waste
1.3M tons/year (coal ash)
2024

📊 Emissions by Scope (2024)

ScopeWhat it coversReported value
Scope 1Direct emissions from sources the company owns or controls (fuel combustion, company vehicles, process and fugitive emissions).44.4M t-CO2e/year

New to scopes? Read Scope 1, 2 and 3 emissions explained and market-based vs location-based Scope 2.

📈 Emissions by Report Period

Report periodHeadline emissions figure reported
202444.4M t-CO2e/year (Scope 1)
202340.64 million tons CO2e (FY2022)
2022-03 to 2023-0362.2M tCO2e/year
202240.64 million tons (FY2022)
202161.7M tCO2e/year

Each row is the headline figure extracted from a different report; scope coverage and methodology can change between years.

✅ Reported Environmental Achievements

🎯 Climate & Sustainability Targets

🔜 Short-term

  • Reduce CO2 emissions from the J-POWER Group’s domestic power generation business: 9.2 million t-CO2 by FY2025

📅 Medium-term

  • Reduce CO2 emissions from the J-POWER Group’s domestic power generation business: 46% (22.5 million t-CO2) by 2030

🔭 Long-term

  • Net-zero emissions by 2050

🌱 ESG Focus Areas

Greenhouse Gas EmissionsAir QualityWater ManagementCoal Ash ManagementWorkforce Health and SafetyNuclear SafetyGrid Resiliency

⚠️ Challenges & Risks +

  • Managing water resources in overseas thermal power plants located in regions with high water stress
  • Phasing out obsolete coal-fired power plants in Japan while maintaining energy supply

📋 Report Information

Reporting Period: 2024
Frameworks: SASB