- Reducing the carbon footprint from waste management.
- Reducing the amount of printing within the organisation.
- Addressing the carbon footprint associated with off-site hybrid working.
- Ensuring data collection for sustainability metrics in a hybrid working environment.
The Walton Centre NHS Foundation Trust
Greenhouse gas emissions & sustainability report data
In its 2022-2025 reporting, The Walton Centre NHS Foundation Trust disclosed greenhouse gas emissions of 2.3M kg CO2 (2020/2021 energy only). Figures are as stated in the company's own report and may use different boundaries, units or methods (for example market-based vs location-based Scope 2), so compare with care.
GHG Emissions
2.3M kg CO2 (2020/2021 energy only)
2022-2025
✅ Reported Environmental Achievements
- Commissioning of a new Combined Heat and Power (CHP) district heating network, resulting in predicted annual financial savings for gas of £50,113 and for electricity of £17,248 and CO2 savings.
- Installation of plate heat exchangers for improved energy efficiency (partially implemented).
- Replacement of main boilers with higher efficiency dual fuel boilers.
- LED internal lighting refurbishments.
- Installation of remote monitoring systems for oil tanks.
- Reduction of 8.14% in CO2 emissions related to energy in 2020/2021 compared to the previous year.
🎯 Climate & Sustainability Targets
🔜 Short-term
- Transfer remaining heating and hot water systems to plate heat exchangers.
- Work with neighboring trusts on renewable energy procurement.
- Upgrade and optimize Building Management System.
- Feasibility studies on renewable energy sources (photovoltaic, heat pumps).
📅 Medium-term
- Further decarbonisation of the site.
- Develop digital tools to monitor the organisation’s true carbon footprint with hybrid working.
- Highlight personal sustainable solutions to the hybrid workforce.
🔭 Long-term
- Net zero emissions by 2045 (aligned with NHS target).
🌱 ESG Focus Areas
Climate ChangeResource EfficiencySocial ResponsibilityEmployee WellbeingSustainable Procurement