- Shrinking demand for new optical fiber lines, limiting costs in maintenance processes, and restrained investment by mobile telecommunications carriers
- Decline in capital investment by NCCs
- Gradual decline in construction volume due to the termination of the FIT system and drastic changes in the business environment
- Manpower shortages in the face of rapidly-growing demand for data center construction
- Japan’s construction industry is facing the “2024 problem” as the grace period for the overtime work limit expires in March 2024.
COMSYS Holdings Corporation
Greenhouse gas emissions & sustainability report data
In its FY2023 reporting, COMSYS Holdings Corporation disclosed greenhouse gas emissions of 1.5K kt-CO2. By scope: Scope 1: 65 kt-CO2; Scope 2: 14 kt-CO2; Scope 3: 1.5K kt-CO2. Figures are as stated in the company's own report and may use different boundaries, units or methods (for example market-based vs location-based Scope 2), so compare with care.
GHG Emissions
1.5K kt-CO2
FY2023
Renewable Energy
25%
of total energy
Waste
93.1K t
FY2023
Energy Use
1.3M GJ
FY2023
📊 Emissions by Scope (FY2023)
| Scope | What it covers | Reported value |
|---|---|---|
| Scope 1 | Direct emissions from sources the company owns or controls (fuel combustion, company vehicles, process and fugitive emissions). | 65 kt-CO2 |
| Scope 2 | Indirect emissions from purchased electricity, steam, heat and cooling. | 14 kt-CO2 |
| Scope 3 | Other indirect emissions across the value chain (purchased goods, business travel, use of sold products, etc.). | 1.5K kt-CO2 |
New to scopes? Read Scope 1, 2 and 3 emissions explained and market-based vs location-based Scope 2.
📈 Emissions by Report Period
| Report period | Headline emissions figure reported |
|---|---|
| FY2023 | 1.5K kt-CO2 |
| 2022 | 1.7M tCO2e/year (Scope 3) |
| 2019-04 to 2020-03 | 6.2K tCO2e (Nippon COMSYS) |
Each row is the headline figure extracted from a different report; scope coverage and methodology can change between years.
✅ Reported Environmental Achievements
- GHG emissions Scope 1+2: 79kt-CO2 (down 21kt-CO2 year on year)
- Scope 3: 1,531kt-CO2 (down 199kt-CO2 year on year)
- 10.2 GWh of green power usage (25% of total usage)
- Successfully completed the construction of Japan’s first optical fiber cable route for telecommunications connecting across the Port of Tokyo.
🎯 Climate & Sustainability Targets
🔜 Short-term
- Reduce GHG emissions by 21% by FY2025
- Virtually zero GHG emissions from Scope 2 by the end of March 2026
- 100% switching to renewable energy electricity by FY2025
📅 Medium-term
- Reduce GHG emissions by 42% by FY2030 (vs. FY2020)
- Reduce Scope 3 emissions by 24% by FY2030 (vs. FY2020)
🔭 Long-term
- Carbon neutrality by FY2050
🌱 ESG Focus Areas
Contributions to local communities through engineering prowess and innovationHuman resource utilization and work-style reform (improvement of engagement)Pursuit of safety and security and complianceMeasures to protect the environmentStrengthening of corporate governance