JORDAN PETROLEUM REFINERY COMPANY (A PUBLIC SHAREHOLDING LIMITED COMPANY)

Greenhouse gas emissions & sustainability report data

📊 Latest report period: 2024-01 to 2024-06🗂️ Report periods on file: 2024-01 to 2024-06, 2023, 2022, 2021, 2020, 2018

Figures are as stated in the company's own report and may use different boundaries, units or methods (for example market-based vs location-based Scope 2), so compare with care.

📈 Emissions by Report Period

Report periodHeadline emissions figure reported
2023525.2K tCO2e/year
2022553.9K tons CO2e (2022)

Each row is the headline figure extracted from a different report; scope coverage and methodology can change between years.

🎯 Climate & Sustainability Targets

🔜 Short-term

  • Complete construction of Aqaba and Hashemite warehouses; establish Muwaffaq Al-Salti Al Azraq Base Station; begin construction of Shaydiyah and Jordan Street stations; update Al-Assaf/Gardens Street station; modernize fifteen Royal Jordanian Air Force and General Security stations; implement a television monitoring system for the domestic transportation and distribution fleet; automate furnace meters and inventory; complete automation of inventory and electronic sales systems at all stations; increase fast-stations by installing 116 electric chargers; install solar power generation systems at several stations; expand the fleet of petroleum product transport vehicles; automate all financial information for real-time display; automate fuel orders from stations through electronic system integration; implement an AI-powered energy consumption monitoring system.

📅 Medium-term

  • Upgrade production lines at Jordan Lube Oil Manufacturing Company to increase production, enhance quality, and diversify products; add new products to meet market needs (e.g., new barrel filling line, viscosity index improver dissolving system); purchase modern lifts and handling equipment; acquire additional delivery trucks; build two new mineral oil tanks in Zarqa; construct five new tanks in Aqaba; produce new types of mineral oils (e.g., gasoline engine oil with API SP, diesel engine oils with CK4 and CJ4); launch industrial grease (EP1, EP2); obtain global accreditations for Jopetrol oils (e.g., Mercedes-Benz, API); expand exports to new foreign markets.

🔭 Long-term

  • Complete the fourth expansion project (VCC heavy oil cracking unit); develop and conduct centralized liquefied gas distribution; construct liquefied gas storage facilities in Zarqa (10,000 tons) and Aqaba (4,000 tons).

⚠️ Challenges & Risks +

  • Negotiations for the fourth expansion project (VCC heavy oil cracking unit) are ongoing, facing challenges in securing financing and meeting conditions set by the Chinese Export Credit Agency (SINOSURE).

📋 Report Information

Reporting Period: 2024-01 to 2024-06
Frameworks: IFRS 8
Assurance: Deloitte & Touche (ME) Jordan (Review Report, not audit)