Taseko Mines Limited

Greenhouse gas emissions & sustainability report data

📊 Latest report period: 2022🗂️ Report periods on file: 2022, 2021, 2020

In its 2022 reporting, Taseko Mines Limited disclosed greenhouse gas emissions of 124.4K tCO2e (Scope 1) + 5972 tCO2e (Scope 2). By scope: Scope 1: 124.4K tCO2e; Scope 2: 6.0K tCO2e. Figures are as stated in the company's own report and may use different boundaries, units or methods (for example market-based vs location-based Scope 2), so compare with care.

💨
GHG Emissions
124.4K tCO2e (Scope 1) + 5972 tCO2e (Scope 2)
2022
⚡
Renewable Energy
50%
of total energy
💧
Water Usage
7.3K thousand cubic meters (consumed)
2022
♻️
Waste
See page 22
2022
⚙️
Energy Use
3.7M GJ
2022

📊 Emissions by Scope (2022)

ScopeWhat it coversReported value
Scope 1Direct emissions from sources the company owns or controls (fuel combustion, company vehicles, process and fugitive emissions).124.4K tCO2e
Scope 2Indirect emissions from purchased electricity, steam, heat and cooling.6.0K tCO2e

New to scopes? Read Scope 1, 2 and 3 emissions explained and market-based vs location-based Scope 2.

📈 Emissions by Report Period

Report periodHeadline emissions figure reported
2022124.4K tCO2e (Scope 1) + 5972 tCO2e (Scope 2)
20211.96 t CO2e/t CuEq (Gibraltar Mine Scope 1)
202096.6K tCO2e (Gibraltar)

Each row is the headline figure extracted from a different report; scope coverage and methodology can change between years.

✅ Reported Environmental Achievements

🎯 Climate & Sustainability Targets

🔜 Short-term

  • Permit, construct, and begin operating a water treatment plant at Gibraltar.

📅 Medium-term

  • Investigate treatment options and secondary uses for surplus water at Florence Copper, aiming for 50% beneficial use.

🔭 Long-term

  • Achieve full commercial production at Florence Copper.
  • Optimize Gibraltar closure plan to return land to a beneficial state supporting native flora and fauna.

🌱 ESG Focus Areas

EnvironmentSocialGovernance

⚠️ Challenges & Risks +

  • Nitrate levels in water stored at Gibraltar's TSF exceeded permit conditions, curtailing discharge to the Fraser River.
  • Need to address surplus water stored at Gibraltar.

📋 Report Information

Reporting Period: 2022
Frameworks: SASB
Assurance: Ruby Canyon Environmental (GHG verification)