- Dependence on single suppliers of raw materials
- Reduced bargaining power with suppliers of critical equipment/services
- Rigidity of supply chain due to the legislative framework
- Bureaucratic culture
- Not optimized organizational structure, rigid processes
- High interest rates on bank loans
- Reduction to half of SNN income in years 2027-2029 after closure of Unit 1 for refurbishment
- Possibility to increase the investment costs in the context of the rise in the price of raw materials and energy, and of inflation
- Legislative amendments concerning taxation of the energy income
Societatea Națională Nuclearelectrica S.A.
Greenhouse gas emissions & sustainability report data
In its 2023-2027 reporting, Societatea Națională Nuclearelectrica S.A. disclosed greenhouse gas emissions of 0 tCO2e/year. Figures are as stated in the company's own report and may use different boundaries, units or methods (for example market-based vs location-based Scope 2), so compare with care.
GHG Emissions
0 tCO2e/year
2023-2027
📈 Emissions by Report Period
| Report period | Headline emissions figure reported |
|---|---|
| 2023-2027 | 0 tCO2e/year |
| 2021 | 1.1K tCO2e/year (2021) |
Each row is the headline figure extracted from a different report; scope coverage and methodology can change between years.
✅ Reported Environmental Achievements
- No CO2 emissions from electricity production
- Low dependence of electricity production cost on uranium price variations
- Relatively constant and predictable production costs
🎯 Climate & Sustainability Targets
🔜 Short-term
- Ensuring an energy production at the level of the industry related standards being the first 25% (top quartile - in WANO/INPO terminology) reactors in the world from the point of view of the capacity factor mediated during the commercial operation (“since in service“).
📅 Medium-term
- Achieving the planned physical production of fuel bundles
- Continuously optimizing and increasing the efficiency of the organizational structure
- Operation of nuclear units in nuclear safe and security conditions
- Consolidating the external communication strategy
- Putting in place the organizational framework for the development of the group structure
🔭 Long-term
- Refurbishment of Cernavoda Unit 1 to extend its lifetime by 30 years
- Refurbishment of Feldioara and Opening of the Uranium Mines
- Changing the intended use of Unit 5
- Performance of the DICA project
- Upgrading the fuel bundle manufacturing and control flow
🌱 ESG Focus Areas
Nuclear SafetySustainable DevelopmentCorporate GovernanceHuman CapitalCommunity Engagement