- Butibori Power Project was not in operation due to protracted delays in legal/regulatory orders, lack of fuel supply, and commercial disputes
- Krishnapatnam UMPP faced viability challenges due to regulatory changes in Indonesia and PPA termination
- Weak financial condition of DISCOMs
- Gas supply deficit impacting gas-based power plants
- Implementation of new environmental norms requiring additional CAPEX
- Reluctance of DISCOMs to enter into long-term PPAs for hydro power
Reliance Power Limited
Greenhouse gas emissions & sustainability report data
By scope: Scope 1: 9.9M tCO2e. Figures are as stated in the company's own report and may use different boundaries, units or methods (for example market-based vs location-based Scope 2), so compare with care.
Water Usage
73.2M kilolitres
2023-04 to 2024-03
Waste
144.4M metric tonnes
2023-04 to 2024-03
📊 Emissions by Scope (2023-04 to 2024-03)
| Scope | What it covers | Reported value |
|---|---|---|
| Scope 1 | Direct emissions from sources the company owns or controls (fuel combustion, company vehicles, process and fugitive emissions). | 9.9M tCO2e |
New to scopes? Read Scope 1, 2 and 3 emissions explained and market-based vs location-based Scope 2.
📈 Emissions by Report Period
| Report period | Headline emissions figure reported |
|---|---|
| 2022-04 to 2023-03 | 30.5M tCO2e/year (Scope 1 & 2) |
Each row is the headline figure extracted from a different report; scope coverage and methodology can change between years.
✅ Reported Environmental Achievements
- Sasan UMPP achieved a Plant Load Factor (PLF) of 93.5%, exceeding the all-India average of 69%
- Sasan Coal Mine efficiently managed 77.8 million BCM, including overburden removal of 65.6 million BCM
- Rosa Thermal Power Plant generated 7,610 MUs
- 40 MW Solar PV plant generated 59.4 MUs
- 100 MW Concentrated Solar Power (CSP) plant produced 35.56 MUs
- 45 MW wind power project generated 50.96 MUs
🌱 ESG Focus Areas