Ascot Resources Ltd.

Greenhouse gas emissions & sustainability report data

📊 Latest report period: 2023🗂️ Report periods on file: 2023

In its 2023 reporting, Ascot Resources Ltd. disclosed greenhouse gas emissions of 9.3K tCO2e/year (Scopes 1 & 2). By scope: Scope 1: 9.2K tCO2e/year; Scope 2: 34 tCO2e/year. Figures are as stated in the company's own report and may use different boundaries, units or methods (for example market-based vs location-based Scope 2), so compare with care.

💨
GHG Emissions
9.3K tCO2e/year (Scopes 1 & 2)
2023
⚡
Renewable Energy
7.9% (indirectly, via BC grid)
of total energy
💧
Water Usage
2.38 million m3/year (effluent discharged)
2023
♻️
Waste
1.8K tons/year (non-mineral)
2023
⚙️
Energy Use
135.3K GJ/year
2023

📊 Emissions by Scope (2023)

ScopeWhat it coversReported value
Scope 1Direct emissions from sources the company owns or controls (fuel combustion, company vehicles, process and fugitive emissions).9.2K tCO2e/year
Scope 2Indirect emissions from purchased electricity, steam, heat and cooling.34 tCO2e/year

New to scopes? Read Scope 1, 2 and 3 emissions explained and market-based vs location-based Scope 2.

✅ Reported Environmental Achievements

🎯 Climate & Sustainability Targets

🔜 Short-term

  • Improve environmental performance with fewer environmental incidents in 2024
  • Meet all permit-required discharge water quality thresholds
  • Zero fatalities, zero Lost Time Injuries, and improve year-over-year Medical Time Incident Frequency rate in 2024
  • Increase the number of training hours and breadth of emergency response training courses

📅 Medium-term

  • Continue to track Scope 1 and Scope 2 GHG emissions and prepare for potential reporting under Provincial and Federal frameworks if emissions exceed 10,000 tonnes of CO2 equivalent
  • Progress plans and initiatives for emissions reduction projects and strategies throughout the mine life at PGP and RMP

🌱 ESG Focus Areas

Health and SafetyEnvironmental StewardshipCommunity RelationsIndigenous RelationsGovernance

⚠️ Challenges & Risks +

  • Construction delays resulted in postponing the installation of the new water treatment system and non-compliance with specific permit conditions
  • Increased number of workers on site from multiple contractors presented new health and safety challenges

📋 Report Information

Reporting Period: 2023
Frameworks: SASB